
Precise Signal Routing. Weather-Sealed Connections. Factory-Spec Dimensions.
Restore power and signal transmission to the left-side deck illumination on the Kukirin G2 Master with this Original Left Side Lamp Connection Cable (Version A). Designed specifically to bridge the electrical gap between the main lower controller and the left LED side panel, this harness resolves lighting failures caused by pinched wires, water-corroded connectors, or road debris impact.
This replacement cable utilizes the exact length and wire gauge required for the left-side routing path inside the scooter's deck. Encased in a highly durable, abrasion-resistant PVC jacket, it protects the internal copper cores from the constant vibrations of the chassis. Equipped with the factory-standard "Version A" waterproof micro-connectors, it provides a secure, snap-in installation that maintains the scooter's IP environmental rating.
Product name |
Left Side Lamp Connection Cable |
Model Number |
XY-KRG2MST015 |
Material |
PC |
Feature |
Easy install |
Fit for |
KuKirin G2 Master scooter, Kick Scooters |
Usage |
Electric Scooters, Kick Scooters, Self-balancing electric scooter |
Keyword |
Kukirin G2 Master Charging Port |
MOQ |
10Pcs |
Weight |
0.02Kg |




Q: What is your MOQ and can I order some samples to check your product quality at first? |
||||||||
A: Samples can be sent for your evaluation, please tell us the model number you are interested in, the qty for each model needed and your detailed address to receive products so that we can we make PI for you soon. |
||||||||
Q: How about your packages? Can we put our logo or print on the packages? |
||||||||
A: Our regular packages are neutral blister packing without logos, OEM/ODM are welcome in our factory, so we can print on your logo or print by silk printing, etc. For further details, please send us an inquiry. |
||||||||
Q: What is your payment terms and how can I place an order? |
||||||||
A: We can receive payment via TT, Paypal, Western union, money gram,etc. For mass production, 30% deposit to confirm the order, and 70% payment to be paid before shipment. |
||||||||
Q: How about your lead time? |
||||||||
A: For samples, it could be 1-2 days to prepare them. And for OEM mass production, it may take 7-10 days depending on your order qty and our production schedule. For ODM orders, please send us inquiry indicating your ideas and requirement so that we can talk in details. |
||||||||
© Copyright 2024 Shenzhen New Image technology Co., Ltd All Rights Reserved Privacy policy