Original Ninebot Max G2 Controller Assembly - Genuine Segway ESC Replacement for Max G2 / G65 Electric Scooter - In Stock Fast ShippingThe Heart of Your Max G2. Original Performance. Seamless Integration.
Is your Ninebot Max G2 displaying a fatal Error Code (like Error 18 or 21), or has a short circuit left your scooter lifeless? The controller is the most critical electronic component of your ride. Don't risk your battery's health or your motor's performance with uncertified, third-party "clones." Restore your scooter to factory-fresh standards with this Official Ninebot Max G2 Controller Assembly.
This is the genuine, high-performance ESC (Electronic Speed Controller) designed specifically for the G2’s 36V/48V architecture. It features the upgraded aluminum heat-sink casing that solves the overheating issues found in older scooter generations. Because this is an original part, it fully supports Ninebot’s proprietary TCS (Traction Control) and ensures your scooter remains compatible with all official firmware updates via the Segway App.



Q: What is your MOQ and can I order some samples to check your product quality at first? |
||||||||
A:Samples can be sent for your evaluation, please tell us the model number you are interested in, the qty for each model needed and your detailed address to receive products so that we can we make PI for you soon. |
||||||||
Q: How about your packages? Can we put our logo or print on the packages? |
||||||||
A: Our regular packages are neutral blister packing without logos, OEM/ODM are welcome in our factory, so we can print on your logo or print by silk printing, etc. For further details, please send us an inquiry. |
||||||||
Q: What is your payment terms and how can I place an order? |
||||||||
A:We can receive payment via TT, Paypal, Western union, money gram,etc. For mass production, 30% deposit to confirm the order, and 70% payment to be paid before shipment. |
||||||||
Q: How about your lead time? |
||||||||
A: For samples, it could be 1-2 days to prepare them. And for OEM mass production, it may take 7-10 days depending on your order qty and our production schedule. For ODM orders, please send us inquiry indicating your ideas and requirement so that we can talk in details. |
||||||||
© Copyright 2024 Shenzhen New Image technology Co., Ltd All Rights Reserved Privacy policy