
Version B Protocol Matching: Manufactured with the specific connector mold and pinout sequence utilized in "Version B" production batches. Guarantees 100% plug-and-play communication with Version B controllers and LED boards.
Left-Side Optimized Length: Precisely cut for the left-side routing path of the chassis, ensuring a clean, factory-spec fit from the controller hub to the left-side deck exit port.
IP-Rated Waterproof Connectors: Equipped with pre-installed micro-plugs featuring internal rubber gaskets. These provide a moisture-proof seal that prevents corrosion and short circuits in the low-voltage lighting line.
Heavy-Duty Protective Sheath: The outer jacket is constructed from high-flexibility TPU/PVC to resist friction against the metal interior of the deck and battery casing during off-road riding.
Integrated Signal Logic: Designed to simultaneously handle multi-function lighting commands, efficiently delivering power for both steady DRL (Daytime Running Light) and turn signal operation.
Product name |
Left Side Lamp Connection Cable |
Model Number |
XY-KRG2MST015B |
Material |
PC |
Feature |
Easy install |
Fit for |
KuKirin G2 Master scooter, Kick Scooters |
Usage |
Electric Scooters, Kick Scooters, Self-balancing electric scooter |
Keyword |
Kukirin G2 Master Charging Port |
MOQ |
10Pcs |
Weight |
0.02Kg |




Q: What is your MOQ and can I order some samples to check your product quality at first? |
||||||||
A: Samples can be sent for your evaluation, please tell us the model number you are interested in, the qty for each model needed and your detailed address to receive products so that we can we make PI for you soon. |
||||||||
Q: How about your packages? Can we put our logo or print on the packages? |
||||||||
A: Our regular packages are neutral blister packing without logos, OEM/ODM are welcome in our factory, so we can print on your logo or print by silk printing, etc. For further details, please send us an inquiry. |
||||||||
Q: What is your payment terms and how can I place an order? |
||||||||
A: We can receive payment via TT, Paypal, Western union, money gram,etc. For mass production, 30% deposit to confirm the order, and 70% payment to be paid before shipment. |
||||||||
Q: How about your lead time? |
||||||||
A: For samples, it could be 1-2 days to prepare them. And for OEM mass production, it may take 7-10 days depending on your order qty and our production schedule. For ODM orders, please send us inquiry indicating your ideas and requirement so that we can talk in details. |
||||||||
© Copyright 2024 Shenzhen New Image technology Co., Ltd All Rights Reserved Privacy policy