
High-Current Wire Gauge: Constructed with heavy-duty internal wiring to safely carry the sustained amperage of 52V chargers without overheating or voltage drop.
Integrated Weather Seal: Features the factory-standard tethered rubber cap, providing essential IP-rated protection against dust, mud, and water ingress when the scooter is in use.
Pre-Wired Controller Plug: Comes complete with the exact factory termination plug required to interface directly with the G2 Master's internal wiring—eliminating the need for dangerous manual soldering or wire splicing.
Arc-Resistant Polymer Housing: The receptacle body is molded from high-temperature, flame-retardant plastic to withstand minor electrical arcing during plug insertion and prevent casing melt.
Threaded Deck Mount: The port features the standard threaded outer body and locking nut for a secure, vibration-proof installation into the scooter's deck or side panel.
Product name |
Charging Port |
Model Number |
XY-KRG2MST016 |
Material |
PC |
Feature |
Easy install |
Fit for |
KuKirin G2 Master scooter, Kick Scooters |
Usage |
Electric Scooters, Kick Scooters, Self-balancing electric scooter |
Keyword |
Kukirin G2 Master Charging Port |
MOQ |
10Pcs |
Weight |
0.01Kg |





Q: What is your MOQ and can I order some samples to check your product quality at first? |
||||||||
A: Samples can be sent for your evaluation, please tell us the model number you are interested in, the qty for each model needed and your detailed address to receive products so that we can we make PI for you soon. |
||||||||
Q: How about your packages? Can we put our logo or print on the packages? |
||||||||
A: Our regular packages are neutral blister packing without logos, OEM/ODM are welcome in our factory, so we can print on your logo or print by silk printing, etc. For further details, please send us an inquiry. |
||||||||
Q: What is your payment terms and how can I place an order? |
||||||||
A: We can receive payment via TT, Paypal, Western union, money gram,etc. For mass production, 30% deposit to confirm the order, and 70% payment to be paid before shipment. |
||||||||
Q: How about your lead time? |
||||||||
A: For samples, it could be 1-2 days to prepare them. And for OEM mass production, it may take 7-10 days depending on your order qty and our production schedule. For ODM orders, please send us inquiry indicating your ideas and requirement so that we can talk in details. |
||||||||
© Copyright 2024 Shenzhen New Image technology Co., Ltd All Rights Reserved Privacy policy